Sandy Spring-Ashton

Rural Preservation Consortium (SSARPC)

The SSARPC supports development in the area that conforms to the

Sandy Spring-Ashton Master Plan. We are pro-Master Plan, not anti-development.


Click for a larger picture Click for a larger picture Click for a larger picture Click for a larger picture Sandy Spring, click for a larger picture Route 108 One Half Mile East of Ashton, click for a larger picture Click for a larger picture Click for a larger picture Wyndcrest, click for a larger picture

Rural Ashton and Sandy Spring



[Click on any picture

 for a larger image]

Artist's drawing of the final Ashton Meeting Place landscape plan

Artist's drawing of the final Ashton Meeting Place landscape plan

Looking southeast from the intersection of Routes 108 and 650, over the corner green, with retail stores on the left and the Sandy Spring Bank on the right

Looking southeast from the intersection of Routes 108 and 650, over the corner green, with retail stores on the left and the Sandy Spring Bank on the right

Conceptual drawing by SSARPC's architect, Miche Booz, of an alternative AMP design, presented at a Planning Board Hearing and later adopted by the developer as the basis for the latest AMP plan.

Conceptual drawing by SSARPC's architect, Miche Booz, of an alternative AMP design, presented at a Planning Board Hearing and later adopted by the developer as the basis for the latest AMP plan.

Pictureboard

Picture Show

Approved AMP

Site Plans

AMP Documents


Home

Derrick's Addition (Northeast Corner)

ezStorage

Bentley Road Nursing Home

Thomas Building (Goddard School and Offices)

Resurrection

Baptist Church

Chevy Chase Bank


About SSARPC

Join Our Email List

Support Our Efforts

Let Your Voice

Be Heard!

Documents and

Announcements

First page Previous page

Page 5 of 5

Question: Are the on-street parking spaces allowed to be counted as part of the required 335 parking spaces?

Answer:  Yes. The Sandy Spring-Ashton Rural Village Overlay Zone allows the Planning Board to approve some of the parking on-street as follows:

Parking must be provided in accordance with the provisions of Division 59-E with the following exception:

(a) In the course of site plan review, the Planning Board may allow some on-street parking to fulfill the requirement for off-street parking to enhance compatibility, provide additional green space and reduce impervious coverage. (Section 59-C-18.185)

Question: What regulations must the Planning Board abide by when they are deciding whether or not to approve the AMP plan?
Answer:  The Planning Board must approve or deny a plan based on its conformance with applicable regulations as detailed in the Planning Staff report, as well as the following additional findings:
59-C-18.186.     Planning Board approval.

The procedures for Planning Board approval under Section 59-D-3.4 are modified for this overlay zone to require the following additional findings:

(a)    The site plan is consistent with the recommendations in the approved and adopted Sandy Spring/Ashton Master Plan;

(b)   The site plan meets all of the requirements of this overlay zone as well as the applicable requirements of the underlying zone; and

(c)    Each structure and use is compatible with other uses and other site plans and with existing and proposed adjacent development.”

Summary

Ashton Meeting Place as currently proposed does not have the scale, design, or orientation of a local village.  The proposed parking does not meet the zoning requirements.  The plan is characteristic of a much more densely developed area such as Olney.  It is not consistent with the intent of the Master Plan.